In order to protect the cooler from breaking, the explosion-proof valve or bypass unloading circuit must be installed when the cooler is installed in the oil return circuit. The best way to use: using another small auxiliary to extract the oil tank inside the mature oil supply cooler, so as to become an independent loop.
In order to ensure that the cooler does not break, when the cooler is installed in the oil return circuit, it is necessary to install an explosion-proof valve or bypass unloading circuit. Recommend the best way to use: use another small pump, extract the oil tank internal heat supply cooler, so as to become an independent loop.
These double pumps consist of two PV2R seires single pumps combined in tandem within a single housing and driven by a common shaft. A Single suction port and two discharge ports are provided so that the output flow can be supplied to separate circuits.